Week 4 assignment — p 4-4 p4-5 p4-10 week 4 assignment

Week 4 Assignment

 

P 4-4 P4-5  P4-10 Week 4 Assignment

 

P 4-4 Listed below are the budgeted factory overhead costs for 2011 for Muncie Manufacturing, Inc.., at the projected level of 2,000 units:

 

EXPENSES:

indirect materials………………………………………..$ 10,000

Indirect labor……………………………………………… 20,000

Power………………………………………………………. 15,000

Straight-line depreciation………………………………. 30,000

Factory property Tax……………………………………. 28,000

Factory Insurance……………………………………….. 12,000

 

Total…………………………………………………………..$115,000

 

Required:

Prepare flexible budgets for factory overhead at the 1,000, 2,000, and 4,000 unit levels. (Hint: You must first decide which of the listed costs should be considered variable and which should be fixed.)

 

 

P4-5 Cake Products Inc, is divided into five departments, mixing, blending, finishing, factory office and building maintenance. The first three departments are engaged in production work. Factory Office and Building Maintenance are service departments. During the month of June, the following factory overhead was incurred for the various departments:             

 

mixing   $21,000                       factory office $9,000

Blending  $18,000                    building maintenance $6,400

finishing  $25,000 

 

The bases for distributing service department expenses to the other departments follow:

 

Building maintenance – on the basis of floor space occupied by the other departments as follows: mixing 10,000 sqft, blending $4,500 sqft, finishing 10,500 sqft and factory office 7,000 sq ft.

 

Factory office – on the basis of number of employees as follows : mixing 30, blending 20 and finishing 50 Prepare schedules showing the distribution of the service departments expenses for the following:

 

1. The direct distribution method                 

2. The sequential distribution method in the order of number of other departments served.

 

P4-10 Con-Aggie Manufacturing Company is studying the results of applying factory overhead to production. The following data have been used: estimated factory overhead: $60,000; estimated materials costs, $50,000; estimated direct labor costs $60,000; estimated direct labor hours 10,000; estimated machine hours 20,000; work in process at the beginning of the month, none.

 

 The actual factory overhead incurred for the month of November was $75,000, and the production statistics on November 30 are as follows:

 

Job Materials Cost Direct Labor Costs Direct Labor Hours Machine Hours Date Jobs Completed

101        5,000                6,000                1000                 3,000              10-Nov

102        7,000                12,000  2,000 3,200 14-Nov

103     8,000 13,500 2,500                4,000                20-Nov

104       9,000                15,600 2,600 3,400                Inprocess

105        10,000              29,000 4,500                6,500                26-Nov

106        11,000              2,400 400                   1,500                In process

Total      50,000              78,500 13,000 21,600

 

 

Required:

1. Compute the predetermined rate, based on the following:

a. direct labor cost,

b. direct labor hours,

c. machine hours.                                                                                    

 

2. Using each of the methods, compute the estimated total cost of each job at the end of the month.                                                                               

3. Determine the under- or overapplied factory overhead, in total, at the end of the month under each of the methods.

 

4. Which method would you recommend, and why?  







Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 10% with the coupon code: best10